Back to news

Goliath Reports Several Holes, Up To 9.89 g/t AuEq Over 12.00 Meters From Surebet Zone Confirming Continuity, As Well As 24.97 Meters Of 0.70 g/t AuEq From Newly Identified And Extensive Big Bulk Zone, Golddigger Property, Golden Triangle, B.C.

Globe Newswire•07/10/2026•06:07 ET
0

Key Highlights

  • ➤GD-26-483 intersected 9.89 g/t AuEq over 12.00 meters in the Surebet Zone
  • ➤Surebet system footprint expanded 12% to 2.01 km² after 2026 step-out drilling
  • ➤Big Bulk Zone returned 24.97 meters of 0.70 g/t AuEq in a newly identified area
  • ➤2026 program completed 48,443 meters across 97 holes with a 100% mineralization hit rate
  • ➤412 of 483 holes contain visible gold; assays remain pending for 55 2026 holes

Expert Statements

Roger Rosmus, Founder & CEO of Goliath Resources Limited

“Every season at Surebet delivers positive surprises. What began as a 2 kilometer surface outcrop has expanded into a remarkably continuous, high-grade gold system across stacked veins and multiple rock units within the last few years, featuring visible gold in 85% of our 483 drill holes. Our 2026 drill program, with up to 750 meters of expansion through step out holes, demonstrates rare structural predictability, proving the mineralization remains coherent throughout. Our team sees host rocks extending over a large area, suggesting we are nowhere close to the extent of the system. Additionally, newly identified broad, lower-grade zones between our high-grade Bonanza and Golden Gate zones called Big Bulk zones open compelling potential for underground bulk mining. The Surebet Discovery continues to show strong potential to become one of the most significant high-grade gold discoveries in British Columbia’s Golden Triangle in many years. We look forward to releasing additional assays from 55 holes that are still pending from our 2026 drill program.”

* Assay results confirm grade continuity across all major mineralized zones at the Surebet High-Grade Gold Discovery that demonstrates predictability of the mineralization model as the system was expanded by more than 1 km along the NE–SW trend and by 100 meters to the north as well as west resulting in a total footprint of the Surebet System increasing to 2.01 Km(2). Assays are still pending for 55 holes drilled in 2026. * Surebet Zone - Drill hole GD-26-483 intersected 9.89 g/t AuEq over 12.00 meters, including 28.81 g/t AuEq over 4 meters consisting of pyrrhotite-galena-sphalerite rich quartz breccia associated with abundant Visible Gold to the Naked Eye (VG-NE), confirming continuity and high-grade nature of the Surebet Zone; see Figures 1., 2. and Table 1. * Accompanying infographics are available at: https://www.globenewswire.com/NewsRoom/AttachmentNg/baed02d0-04cb-46cd-a550-9301bd20118 https://www.globenewswire.com/NewsRoom/AttachmentNg/eb7c7089-512d-41bd-97aa-549f3ff989e6

Get started

Create a free account to read the full story.

Sign Up

Already have an account? Log in