NexGen Grows High-Grade Subdomain Vertically and Along Strike and Further Confirms Strong Continuity of Intense High-Grade Mineralization at Patterson Corridor East (PCE)
Key Highlights
- ➤PCE high-grade vertical extent reaches 739 m, expanding 95 m or 15%
- ➤PCE high-grade strike length reaches 238 m, expanding 28 m or 13%
- ➤2026 drilling expands overall mineralized footprint to 905 m vertically, up 29%
- ➤2026 drilling expands overall mineralized footprint along strike to 678 m, up 9%
- ➤RK-26-300 intersects cumulative 10.0 m above 10,000 cps, including 1.8 m above 61,000 cps
Expert Statements
Leigh Curyer, Founder & Chief Executive Officer of NexGen Energy Ltd.
“These drill results add considerable geological understanding of the PCE discovery. The shape, size and distribution of mineralization point to a significant shear-hosted system, currently spanning over 905 metres vertically and 678 metres along strike. The high-grade at PCE continues to grow and show strong continuity which are both characteristics of the Arrow Deposit during its development. We are developing this large mineralized system systematically consistent with our approach to the Arrow Deposit. PCE, combined with Arrow and the district-scale land position NexGen holds further solidifies our position as the key supplier to global utilities for many decades to come.”
* Vertical extent of high-grade subdomain increased a further 95 m to 739 m, a growth of 15%, by RK-26-293c1 with cumulative 2.5 m of >10,000 cps. * Strike length of high-grade subdomain increased by 28 m to 238 m, expanding by 13% with new intersections to both the southwest and northeast. * To date, the 2026 drilling campaign has increased the overall mineralized footprint vertically by 205 m to 905 m, a 29% increase, and along strike by a further 58 m to 678 m, a 9% increase. * Strong continuity of intense high-grade confirmed with hole RK-26-300 intersecting cumulative 10.0 m of >10,000 cps including 1.8 m of >61,000 cps located 25.0 m from RK-24-207 (9.5 m at 2.9% U(3)O(8), including 0.5 m at 28.2% U(3)O(8)) and 29.0 m from RK-25-230 (7.5 m at 5.3% U(3)O(8), including 0.5 m at 35.9% U(3)O(8)). * Southwest portion of high-grade subdomain has emerged as key growth area with continuity expanded by cumulative 4.2 m of >10,000 cps in RK-26-299c1 and deep extension potential from cumulative 6.0 m of >10,000 cps (including 0.7 m of >61,000 cps) in RK-26-297c1. Vancouver, British Columbia--(Newsfile Corp. - November 24, 2026) - NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) ("NexGen" or the "Company") announces results from fifteen additional drill holes from the ongoing 2026 drilling at the Company's 100% owned PCE discovery located 3.5 km from the Arrow Deposit. These results expand the high-grade subdomain while also systematically confirming the internal continuity of intense high-grade mineralization (Figures 1 and 2, Table 1).
Get started
Create a free account to read the full story.
