Plug Launches GenEco™ Scale, an Integrated Electrolyzer Plant Offering with Arcadia eFuels’ 280 MW Project ARC as First Customer
Globe Newswire•17/11/2026•07:00 ET
35
Key Highlights
- ➤Plug launches GenEco Scale, a utility-scale integrated electrolyzer plant offering
- ➤Arcadia eFuels selects GenEco Scale for 280 MW Project ARC in Texas
- ➤Project ARC targets approximately 23.2 million gallons of e-SAF annually
- ➤GenEco Scale targets less than one acre per 100 MW capacity
- ➤Plug has shipped more than 320 MW of PEM electrolyzer capacity worldwide
Expert Statements
Amy Hebert, Chief Executive Officer of Arcadia eFuels
“When developing a project of this scale, it's not just about selecting the right technology. It's about having a clear, cost-effective path from engineering through construction.”
Amy Hebert, Chief Executive Officer of Arcadia eFuels
“Reducing the engineering burden on our EPC partners and minimizing the complexity of bringing these systems together were important considerations for Project ARC. We see GenEco Scale as an approach that can help us move forward with greater efficiency and confidence, building on our established partnership with Plug. Together, we're taking another step toward producing the world's future fuels to protect our environment and power our world.”
José Luis Crespo, President and Chief Executive Officer of Plug
“Our customers aren't just looking for more electrolyzer capacity. They're looking for ways to build large-scale hydrogen projects at a lower cost.”
José Luis Crespo, President and Chief Executive Officer of Plug
“By reducing the physical footprint and infrastructure required, we're helping developers lower capital expenditures and improve overall project economics. GenEco Scale is purpose-built for projects like Arcadia eFuels' 280 MW Project ARC, where efficiency and cost optimization are critical at this scale.”
New integrated plant offering combines proven PEM technology with a standardized outdoor-ready 20 MW block architecture to reduce costs, accelerate execution and streamline utility-scale hydrogen deployment
Pre-engineered design reduces traditional EPC engineering and integration scope, with a next-generation balance-of-plant architecture targeting a footprint of less than one acre per 100 MW of electrolyzer capacity
Get started
Create a free account to read the full story.
