Xos Heads to RE+ 2026 with Rapidly Deployable Power Hub Energy Storage
Key Highlights
- ➤Power Hub storage spans 210 kWh to 3.1 MWh per unit
- ➤Power Hub delivers up to 1.5 MW output per unit
- ➤Up to 32 units connect in parallel for multi-megawatt sites
- ➤More than 250 MWh is already deployed across North America
- ➤AC Power Hub offers towable, battery-buffered mobile power without permanent installation
Expert Statements
Dakota Semler, Chief Executive Officer of Xos
“Energy infrastructure has traditionally been a permanent, multi-year bet. The Power Hub turns it into a flexible asset: customers deploy it where they need power, scale it as demand grows, and move it when the project ends, with no stranded capital. Designed in California and manufactured in Tennessee, it also means fewer shipping delays, faster domestic service, and eligibility for public projects with Buy American requirements. Speed, flexibility, and American manufacturing are what Xos is building its energy storage business around.”
* Plans to showcase the Xos Power Hub™ line, rapidly deployable energy storage available from 210 kWh to 3.1 MWh per unit * Displays the AC Power Hub, a towable unit that arrives, connects, and moves with the job * Invites data center, utility, and industrial teams to Booth W15500 at the Las Vegas Convention Center LOS ANGELES, Oct. 20, 2026 (GLOBE NEWSWIRE) -- Xos, Inc. (NASDAQ: XOS) (“Xos” or the “Company”), a leading energy storage and fleet electrification solutions provider, today announced its participation in RE+ 2026, North America's largest clean energy event. Xos will share Booth W15500 with Pioneer eMobility at the Las Vegas Convention Center from November 16 to 19, 2026.
At the show, Xos will present the Power Hub line and display the AC Power Hub on the booth floor. Visitors will see how Power Hub storage arrives fully integrated, connects to any source, and powers a site in days instead of the years a new grid connection can take.
Get started
Create a free account to read the full story.
